High BTU Pipeline project
Location: Ft Bend Regional Landfill Needville, TX
Landfill Owner: Waste Corporation of TX
Description: High BTU Pipeline
Scope of Work:
- All planning, permitting, engineering, contracts and installation were completed by EPS in conjunction with Morrow Renewables
- Construct Gas Collection and Control System (GCCS) loop around with 18”, 10”, and 8” HDPE header lines
- Over 50,000 linear feet of HDPE piping
- 120 vertical gas wells
- Blower and Flare Station