Bi County Gas Producers, LLC

A Landfill-Gas-To-Energy Project

Location: Woodlawn, TN

Owner: Bi County Solid Waste Landfill

Online Date: July 2011

Description: Complete development to own and operate project. Bi-County is a LFG to Energy site that utilizes two Caterpillar gensets capable of producing 2.95 mW of electricity.

Scope of Work:

  • All planning, permitting, engineering, contracts and installation were completed by EPS
  • Construct Gas Collection and Control System (GCCS) loop around landfill with 18”, 10” and 8” header lines
  • State of the art treatment skid for optimal cleansing of the LFG
  • Caterpillar 3516A+ engine with Best Available Control Technology
  • All GCCS, Gas Treatment and Engine O&M along with Back Office Support

Noteworthy: Enerdyne developed the project as a completely voluntary action. BCGP was the first project in the United States to use a Cat 3516A+ for a LFG Project.